zum Seiteninhalt
|

PTB > Structure > Division 7 > Department 7.1 > Working Group 7.13

Working Group 7.13
Instrumentation Berlin-Adlershof


Symbol Working Group 7.13

Fields of activity

- design, construction and commisioning of experimental setups for use with synchrotron radiation
- maintenance of the scientific infrastructure
- support on technical questions




Tasks

The instrumentation group in Berlin-Adlershof is responsible for design, construction and commisioning of beamlines and experimental setups and the scientific infrastructure at both locations, the PTB laboratory at BESSY II and the Willy Wien Laboratory.

Contact

Head of Working Group
Rolf Fliegauf
Tel.: +49-30-6392-5093
E-Mail:
 
Address
Physikalisch-Technische Bundesanstalt
Working Group 7.13
Abbestr. 2-12
10587 Berlin

© Physikalisch-Technische Bundesanstalt
Last Change: 2009-01-23,
Valid XHTML 1.0 Transitional